top of page

DOT RELEASE: O'AHU LANE CLOSURES FOR WEEK OF FEB. 29 - MARCH 6

PLEASE NOTE: Lane closure schedules may change at any time without further notice. 

All projects are weather permitting.



--- H-1 FREEWAY ---

1) EWA

Right lane closure on the H-1 Freeway in both directions between the Kunia offramp (Exit 5B) and the Kualakai Parkway underpass on Monday, March 2, through Friday, March 6, from 9 a.m. to 3 p.m., for maintenance work.


2) HONOLULU (WEEKEND/NIGHT WORK)

Lane closure on the eastbound Airport offramp (Exit 16) to Paiea Street/Aolele Street on Sunday night, March 1, through Friday morning, March 6, from 9 p.m. to 5 a.m., for The Rail project.

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


3) HONOLULU (NIGHT WORK)

Two right lane closures on the H-1 Freeway in the westbound direction in the vicinity of Richard Lane on Monday, March 2, through Wednesday, March 4, from 10 p.m. to 12 a.m., for wall construction.


4) HONOLULU

Lane closure on the H-1 Freeway in the eastbound direction between Waikiki/Nimitz Highway (Exit 18A) and Nimitz Highway on Friday, March 6, from 9 a.m. to 11 a.m., for maintenance work.


5) HONOLULU

Left lane closure on the H-1 Freeway in both directions between the Punahou Street overpass and the Keehi Interchange on Tuesday, March 3, from 2 a.m. to 6 p.m., for maintenance work.


6) HONOLULU

Lane closure on the H-1 Freeway in both directions between the Kapiolani Interchange and Ainakoa Avenue on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m., for guardrail and shoulder improvements. The speed limit in this area is reduced to 40 mph during closure hours.


7) KAPOLEI (NIGHT WORK)

Closure of the Campbell Industrial Park/Barbers Point Harbor offramp (Exit 1A) from the eastbound H-1 Freeway on Monday night, March 2, through Friday morning, March 6, from 10 p.m. to 4 a.m., for the Kapolei Interchange Complex Phase 2 project. Motorists will be directed to Wakea Street offramp as an alternate route.

For more information, visit the Kapolei Interchange Complex Phase 2 project website at https://www.buildkapolei.com/


8) KAPOLEI (NIGHT WORK)

Closure of the H-1 Freeway in the eastbound direction between the Campbell Industrial Park/Barbers Point Harbor offramp (Exit 1A) and the Wakea Street onramp on Monday night, March 2, through Friday morning, March 6, from 9 p.m. to 4:30 a.m., for the Kapolei Interchange Complex, Phase 2 project. Eastbound motorists will be directed to Kalaeloa Boulevard as an alternate route. Closure will only occur if the westbound lanes are open.

For more information, visit the Kapolei Interchange Complex Phase 2 project website at https://www.buildkapolei.com/


9) KAPOLEI (WEEKEND/NIGHT WORK)

Closure of the H-1 Freeway in the westbound direction between the Makakilo Drive overpass and the Campbell Industrial Park/Barbers Point Harbor offramp (Exit 1) on Sunday night, March 1, through Friday morning, March 6, from 10 p.m. to 5 a.m., for the Kapolei Interchange Complex Phase 2 project. Motorists will be directed to Makakilo/Kapolei/Kalaeloa offramp (Exit 2) as an alternate route.

For more information, visit the Kapolei Interchange Complex Phase 2 project website at https://www.buildkapolei.com/


10) KAPOLEI (WEEKEND/NIGHT WORK)

Closure of the H-1 Freeway in the westbound direction between the Kapolei/Ewa offramp (Exit 3) and the Makakilo Drive overpass, on Sunday night, March 1, through Friday morning, March 6, from 10:30 p.m. to 4 a.m., for the Kapolei Interchange Complex Phase 2 project. Motorists will be directed to the Kapolei/Ewa offramp (Exit 3) as an alternate route.

For more information, visit the Kapolei Interchange Complex Phase 2 project website at https://www.buildkapolei.com/


11) PEARL HARBOR (WEEKEND/NIGHT WORK)

Lane closure on the Nimitz Highway/Hickam AFB offramp (Exit 15) from the H-1 Freeway in the eastbound direction on Sunday night, March 1, through Friday morning, March 6, from 8 p.m. to 4 a.m., for The Rail project.

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


12) PEARL HARBOR (NIGHT WORK)

Roving lane closures on the H-1 Freeway in both directions in the vicinity of the Keehi Interchange on Monday night, March 2, through Friday morning, March 6, from 9 p.m. to 5 a.m., for maintenance work.


13) WAIPAHU

Lane closure on the H-1 Freeway in the eastbound direction in the vicinity of the Managers Drive overpass on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 12:30 p.m., for guardrail repairs.


--- H-2 FREEWAY ---


1) MILILANI

Right lane closure on the H-2 Freeway in the northbound direction in the vicinity of Meheula Parkway on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 2 p.m., for tree trimming.


2) WAHIAWA

Lane closure on the H-2 Freeway in both directions in the vicinity of Wilikina Drive on Wednesday, March 4, through Friday, March 6, from 9 a.m. to 11 a.m., for maintenance work.


--- H-201 MOANALUA FREEWAY ---


1) MOANALUA (WEEKEND/NIGHT WORK)

Right lane closure on the H-201 Moanalua Freeway in the westbound direction between Ola Lane and Funston Road overpass on Sunday night, March 1, through Friday morning, March 6, from 9 p.m. to 4 a.m., for lighting work.


2) MOANALUA

Left lane closure on the H-201 Moanalua Freeway in the eastbound direction in the vicinity of the Funston Road overpass on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m., for maintenance work. Left lane will be closed on King Street at Funston Road during this time.


3) MOANALUA (WEEKEND/NIGHT WORK)

Lane closure on the H-201 Moanalua Freeway in the westbound direction between the Middle Street overpass and the Funston Road overpass, on Sunday, March 1, through Monday, March 2, from 9 p.m. to 4 a.m., for lighting work. The onramp from Kaua Street to the H-201 Moanalua Freeway will be closed.


4) MOANALUA (NIGHT WORK)

Lane closure on the H-201 Moanalua Freeway in the eastbound direction between the Funston Road overpass and the Middle Street overpass on Wednesday, March 4, through Friday, March 6, from 9 p.m. to 4 a.m., for road repairs.


--- H-3 FREEWAY ---


1) KANEOHE (WEEKEND/NIGHT WORK)

Roving lane closure on the H-3 Freeway in both directions in the vicinity of the Harano Tunnels on Sunday night, March 1, through Friday morning, March 6, from 8 p.m. to 4 a.m., for delineator work.


--- FARRINGTON HIGHWAY (ROUTES 93/930) ---


1) KAPOLEI

Lane closure on Farrington Highway in both directions in the vicinity of Upena Street on Monday, March 2, through Wednesday, March 4, from 8:30 a.m. to 12:30 p.m., for maintenance work.


2) KAPOLEI (WEEKEND/NIGHT WORK)

Closure of Farrington Highway in both directions between Wakea Street and Kalaeloa Boulevard at the H-1 Freeway underpass on Saturday, Feb. 29, through Saturday, March 7, over a 24-hour period, for bridge work. For more information, visit the Kapolei Interchange Complex Phase 2 project website at https://www.buildkapolei.com/


3) NANAKULI (NIGHT WORK)

Lane closure on Farrington Highway (Route 93) in the eastbound direction between Waiomea Street and Laaloa Street on Monday night, March 2, through Friday morning, March 6, from 8:30 p.m. to 5 a.m., for signage work.


4) WAIANAE

Right lane closure on Farrington Highway (Route 93) in the eastbound direction between Maipalaoa Road and St. John’s Road on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m., for the Maipalaoa Bridge Replacement project. Two lanes are open in the eastbound direction and one lane in the westbound direction.


5) WAIANAE

Lane closure on Farrington Highway in both directions between Moua Street and Makua Valley Road on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m., for overhead utility work. Traffic will be contraflowed.


6) WAIANAE

Roving lane closure on Farrington Highway (Route 93) in both directions between Kili Drive and Kaena Point on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m., for paving work.


7) WAIPAHU TO PEARL CITY (HART JURISDICTION)

Farrington Highway (Route 7101) between Kahi Mohala and Waipahu High School is City Maintained State Highway.


Lanes will be closed as needed on Farrington Highway (Route 7101) between Kunia Road and the H-1 Freeway Overpass (near Leeward Community College), on Sunday, March 1, through Friday, March 6, from 8:30 a.m. to 3 p.m., for rail work.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299


--- KAHEKILI HIGHWAY (ROUTE 83) ---


1) KANEOHE

Roving closure on Kahekili Highway (Route 83) in both directions between Kamehameha Highway and Likelike Highway on Monday, March 2, through Friday, March 6, from 7:30 a.m. to 12:30 p.m., for pothole repairs.


--- KALANIANAOLE HIGHWAY (ROUTES 61/72) ---


1) HAWAII KAI

Lane closure on Kalanianaole Highway in the eastbound direction between Waa Street and Kaai Street on Tuesday, March 3, through Friday, March 6, from 8:30 a.m. to 3 p.m., for tree trimming work. Traffic will be contraflowed.


2) WAIMANALO

Lane closure on Kalanianaole Highway in the eastbound direction in the vicinity of Tinker Road on Friday, March 6, from 8:30 a.m. to 3 p.m., for pole replacement work. Traffic will be contraflowed.


--- KAMEHAMEHA HIGHWAY (ROUTES 80/83/99) ---


1) HALAWA TO JOINT BASE PEARL HARBOR HICKAM (HART JURISDICTION)

Kamehameha Highway (Route 99) between Aloha Stadium and Center Drive is City Maintained State Highway.


Lanes may be closed as needed on Kamehameha Highway in both directions between Center Drive and Salt Lake Boulevard, 24 hours a day, seven days a week.

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


2) HALEIWA

Lane closure on Kamehameha Highway in the southbound direction in the vicinity of Ashley Road on Wednesday, March 4, from 8:30 a.m. to 2 p.m., for landscaping work.


3) HAUULA (WEEKEND WORK)

Single lane closure on Kamehameha Highway (Route 83) in the northbound direction between Pokiwai Place and Hauula Beach Homes Road, on Saturday, Feb. 29, from 7 a.m. to 6:30 p.m., for emergency shoreline repairs, pavement marking and delineator installations. Traffic in both directions will be maintained through a contraflow.


4) HAUULA

Lane closure on Kamehameha Highway (Route 83) in the southbound direction in the vicinity of Hauula Homestead Road on Friday, March 6, from 8:30 a.m. to 3 p.m., for pole replacements.


5) HAUULA

Roving closure on Kamehameha Highway (Route 83) in both directions in the vicinity of Kukuna Road on Monday, March 2, from 8:30 a.m. to 1:30 p.m., for landscaping work.


6) HONOLULU (NIGHT WORK)

Lane closure on Kamehameha Highway (Route 99) in the eastbound direction between Center Drive and Nimitz Highway on Monday, March 2, through Friday, March 6, from 8 p.m. to 4 a.m., for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


7) HONOLULU (HART JURISDICTION)

One lane closure on Kamehameha Highway in both directions between Middle Street and Puuhale Road, for The Rail project.


  • On Sunday, March 1, through Friday, March 6, from 7 p.m. to 5 a.m.

  • On Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


8) HONOLULU (HART JURISDICTION)

Lane closure on Kamehameha Highway in both directions between Kaonohi Street and Lehua Avenue on Sunday, March 1, through Friday, March 6, over a 24-hour period, for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


9) KAAAWA (WEEKEND WORK)

Lane closure on Kamehameha Highway in the northbound direction in the vicinities of Kaaawa Valley Road, Kanenelu Beach, Crouching Lion, Kaaawa Elementary School and Polinalina Road on Saturday, Feb. 29, from 7 a.m. to 6:30 p.m., for emergency shoreline repairs, pavement marking and delineator installations. Traffic in both directions will be maintained through a contraflow.


10) KAHALUU (WEEKEND WORK)

Lane closure on Kamehameha Highway in the northbound direction in the vicinity of Kualoa Ranch on Saturday, Feb. 29, from 7 a.m. to 6:30 p.m., for emergency shoreline repairs, pavement marking and delineator installations. Traffic in both directions will be maintained through a contraflow.


11) KAHUKU

Lane closure on Kamehameha Highway (Route 83) in the southbound direction in the vicinity of Puuluana Street on Thursday, March 5, from 8:30 a.m. to 12:30 p.m., for road improvements. Traffic will be contraflowed.


12) KAHUKU

Lane closure on Kamehameha Highway (Route 83) in the northbound direction in the vicinity of Pahipahialua Street on Thursday, March 5, from 8:30 a.m. to 3 p.m., for pole replacement work. Traffic will be contraflowed.


13) KAHUKU

Lane closure on Kamehameha Highway (Route 83) in both directions in the vicinity of Marconi Road on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m., for road improvements. Traffic will be contraflowed.


14) MILILANI (WEEKEND CLOSURE)

Lane closure on Kamehameha Highway (Route 99) in the nortbound direction between Lanikuhana Avenue and Meheula Parkway on Sunday, March 1, from 6 a.m. to 12 p.m., for the YMCA 5K Fun Run.


15) PEARL CITY

Lane closure on Kamehameha Highway (Route 99) in the westbound direction in the vicinity of Waihona Street on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m., for waterline work.


16) PUPUKEA

Lane closure on Kamehameha Highway (Route 83) in the southbound direction between Pupukea Road and Kapuhi Street on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m., for HECO work.


17) WAIKANE TO AHUIMANU

Alternating lane closure on Kamehameha Highway in both directions between Waikane Valley Road and Ahuimanu Road on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m., for striping work. Traffic will be contraflowed.


18) WAHIAWA

Right lane closure on Kamehameha Highway in both directions in the vicinity of Wilikina Drive on Monday, March 2, through Friday, March 6, from 8 a.m. to 3 p.m., for maintenance work.


19) MILILANI

Lane closure on Kamehameha Highway (Route 99) in the northbound direction between Ka Uka Boulevard and Lanikuhana Avenue on Monday, March 2, from 8 a.m. to 2 p.m., for tree trimming. Traffic will be contraflowed.


20) PUNALUU TO WAIKANE

Lane closure on Kamehameha Highway in the southbound direction between Punaluu Valley Road and Haupoa Street on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m., for pole replacement work. Traffic will be contraflowed.


--- LIKELIKE HIGHWAY (ROUTE 63) ---

1) KALIHI

Right lane closure on Likelike Highway in the northbound direction between North School Street and Alu Street on Tuesday, March 3, through Friday, March 6, from 8 a.m. to 1 p.m., for maintenance work.


--- NIMITZ HIGHWAY (ROUTE 92) ---


1) HONOLULU (HART JURISDICTION)

Nimitz Highway (Route 92) between Richards Street and Awa Street is City Maintained State Highway.


Lane closures on Nimitz Highway in both directions between River Street and Richards Street over a 24-hour period, seven days a week.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


2) HONOLULU (NIGHT WORK)

Right lane closure on Nimitz Highway (Route 92) in the eastbound direction in the vicinity of the Valkenburgh Street intersection on Monday, March 2, through Thursday, March 5, from 8:30 a.m. to 3 p.m., for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


3) HONOLULU (HART JURISDICTION)

Nimitz Highway (Route 92) between Elliott Street and Sand Island Access Road is City Maintained State Highway.


Lanes closed in the eastbound direction between Elliott Street and Aolele Street from Sunday, March 1, through Friday, March 6, through Friday, Feb. 28, from 8:30 a.m. to 3 p.m. and from 8 p.m. to 4 a.m.


Lanes closed in both directions between Sand Island Access Road and Lagoon Drive on Sunday, March 1, through Friday, March 6, from 8 :30 a.m. to 3 p.m. and from 9 p.m. to 5 a.m.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


4) HONOLULU (NIGHT WORK)

Lane closure on Nimitz Highway (Route 92) in both directions between Sand Island Access Road and Pacific Street on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m., and from 8 p.m. to 4 a.m., for pothole repairs and flow monitoring.


5) HONOLULU (NIGHT WORK)

Roving lane closure on Nimitz Highway (Route 92) in both directions between Valkenburgh Street and Middle Street on Monday, March 2, through Friday, March 6, from 9 p.m. to 4 a.m., for lighting work.


6) HONOLULU (WEEKEND/NIGHT WORK)

Right lane closure on Nimitz Highway (Route 92) in the eastbound direction between Valkenburgh Street and Aolele Street on Sunday night, March 1, through Friday morning, March 6, from 8 p.m. to 4 a.m., for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


7) HONOLULU (WEEKEND/NIGHT WORK)

Lane closure on Nimitz Highway (Route 92) in the eastbound direction between the offramp from the H-1 Freeway and Middle Street on Sunday, March 1, through Friday, March 6, from 9 p.m. to 5 a.m., for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


8) HONOLULU (WEEKEND/NIGHT WORK)

Lane closure on Nimitz Highway (Route 92) in both directions between Puuhale Road and Alakawa Street on Sunday, March 1, through Friday, March 6, from 6 p.m. to 2 a.m., for sewer work.


9) HONOLULU (NIGHT WORK)

Lane closure on Nimitz Highway (Route 92) in both directions between Sand Island Access Road and Lagoon Drive on Sunday, March 1, through Friday, March 6, for The Rail project.


  • Westbound lane will be closed from 8:30 a.m. to 3 p.m.

  • Eastbound lane will be closed from 9 p.m. to 5 a.m.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


10) HONOLULU (HART JURISDICTION)

Nimitz Highway (Route 92) between Awa Street and Halekauwila Street is a City Maintained State Highway


Lane closures on Nimitz Highway (Route 92) in both directions between Alakea Street and Awa Street on Sunday, March 1, through Friday, March 6, from 8:30 a.m. to 3 p.m. and from 6 p.m. to 5 a.m., for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299


--- PALI HIGHWAY (ROUTE 61) ---


1) NUUANU (NIGHT WORK)

Lane closures on the Pali Highway in both directions between Auloa Road and Nuuanu Pali Drive on Monday, March 2, through Friday, March 6, for construction activities.


For more information visit the City’s Dowsett Highlands Sewer Relief project website at http://palisewer.org


2) NUUANU

Right lane closure on the Pali Highway in the Honolulu-bound direction between Country Club Road and Wylie Street on Monday, March 2, through Friday, March 6, from 9 a.m. to 3:30 p.m., for the Dowsett Highlands Sewer Relief project.


For more information visit the City’s Dowsett Highlands Sewer Relief project website at http://palisewer.org


3) NUUANU

Right lane closure on the Pali Highway (Route 61) in both directions between Wylie Street and Vineyard Boulevard on Monday, March 2, through Friday, March 6, for electrical and median work.


  • Honolulu-bound lane closed from 9 a.m. to 5 p.m.

  • Kaneohe-bound lane closed from 7 a.m. to 3 p.m.


For more information, please view the project website at http://palihighway.org.


4) NUUANU

Lane closures on the Pali Highway (Route 61) in both directions in the vicinity of Dowsett Avenue on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3:30 p.m., for sewer work.


For more information visit the City’s Dowsett Highlands Sewer Relief project website at http://palisewer.org


--- ALA MOANA BOULEVARD ---


1) HONOLULU (WEEKEND CLOSURE)

Closures on Ala Moana Boulevard in both directions between Alakea Street and Kamakee Street on Sunday, March 1, from 6:45 a.m. to 9 a.m., for the Honolulu Marathon King’s Runner 10K.


Eastbound lanes will be closed from Alakea Street to Keawe Street.Westbound lanes will be closed from Ward Avenue to Keawe Street.Two eastbound lanes closed from Ward Avenue to Kamakee Street.No turns will be allowed into and out of Ala Moana Beach Park at the Ala Moana Blvd/Kamakee Street intersection.



2) HONOLULU (NIGHT WORK)

Lane closure on Ala Moana Boulevard in both directions between Channel Street and Coral Street on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m. and 8 p.m. to 4 a.m., for utility installations.


3) HONOLULU (NIGHT WORK)

Lane closure on Ala Moana Boulevard in the eastbound direction in the vicinity of South Street on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m. and 8 p.m. to 4 a.m., for maintenance work.


4) HONOLULU

Right lane closure on Ala Moana Boulevard in the eastbound direction between Ward Avenue and Kamakee Street on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m., for maintenance work.


--- KALAELOA BOULEVARD ---


1) KAPOLEI (WEEKEND/NIGHT WORK)

Closure of Kalaeloa Boulevard in the northbound direction between Kapolei Parkway and Farrington Highway on Sunday night, March 1, through Friday morning, March 6, from 8 p.m. to 4:30 a.m., for the Kapolei Interchange Complex Phase 2 project. Motorists will be detoured to Kapolei Parkway.


For more information, visit the Kapolei Interchange Complex Phase 2 project website at https://www.buildkapolei.com/


--- VINEYARD BOULEVARD ---


1) HONOLULU (NIGHT WORK)

Roving lane closure on Vineyard Boulevard in both directions between Palama Street and Lusitania Street on Monday, March 2, through Friday, March 6, from 9 p.m. to 4 a.m., for lighting work.


--- LAGOON DRIVE ---


1) HONOLULU

Lane closure on Lagoon Drive in the northbound direction between Aolele Street and Waiwai Loop on Monday, March 2, through Friday, March 6, from 7 a.m. to 5 p.m., for The Rail work.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


--- KUALAKAI PARKWAY ---


1) EWA (HART JURISDICTION)

Kualakai Parkway between Farrington Highway and Keahumoa Parkway is City Maintained State Highway.


Lane closure on Kualakai Parkway in both directions between Keahumoa Parkway and Farrington Highway on Monday, March 2, through Friday, March 6, from 8:30 a.m. to 3 p.m., for the rail. One through lane is to remain open.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299


2) KAPOLEI

Lane closure on Kualakai Parkway in both directions between Farrington Highway and the H-1 Freeway on Tuesday, March 3, and Friday, March 6, from 9 a.m. to 11 a.m., for maintenance work.


--- FORT BARRETTE ROAD ---


1) KAPOLEI (NIGHT WORK)

Four lane closures on Fort Barrette Road one direction at a time at the Farrington Highway intersection on Monday night, March 2, through Friday morning, March 6, from 9 p.m. to 4 a.m., for resurfacing work. Traffic will be let through by the remaining open lane.


--- FORT WEAVER ROAD (ROUTE 76) ---


1) EWA

Left lane closure on Fort Weaver Road (Route 76) in both directions between the H-1 Freeway and Farrington Highway on Monday, March 2, through Friday, March 6, from 9 a.m. to 11 a.m., for maintenance work.


2) EWA

Lane closure on Fort Weaver Road in both directions in the vicinity of Farrington Highway on Monday, March 2, through Thursday, March 5, from 8:30 a.m. to 2 p.m., for bridge maintenance.

--- JARRETT WHITE ROAD ---


1) MOANALUA (NIGHT WORK)

Roving closure on Jarrett White Road in both directions between Tripler Hospital and Puuloa Road on Monday night, March 2, through Friday morning, March 6, from 9 p.m. to 4 a.m., for lighting work.


--- KAILUA ROAD ---


1) KAILUA

Lane closure on Kailua Road in both directions between Ulumanu Drive and Kalanianaole Highway on Monday, March 2, through Friday, March 6, from 9 a.m. to 1:30 p.mkaai., for sign replacements.


---PUULOA ROAD ---


1) MOANALUA (NIGHT WORK)

Roving lane closures on Puuloa Road/Jarrett White Road in both directions between Nimitz Highway and Tripler Hospital on Monday, March 2, through Friday, March 6, from 7:45 a.m. to 1:30 p.m. and from 9 p.m. to 4 a.m., for lighting, maintenance and restriping work.


--- SAND ISLAND ACCESS ROAD ---


1) KALIHI (NIGHT WORK)

Roving closure on Sand Island Access Road in both directions between Nimitz Highway and Ulupono Street on Monday, March 2, through Friday, March 6, from 9 p.m. to 4 a.m., for maintenance work.


2) KALIHI

Right lane closure on Sand Island Access Road in both directions between Nimitz Highway and Pahounui Drive on Monday, March 2, through Friday, March 6, from 7:45 a.m. to 12:30 p.m., for lighting maintenance.


3) KALIHI

Roving closure on Sand Island Access Road in both directions in the vicinity of Nimitz Highway on Monday, March 2, through Friday, March 6, from 7:45 a.m. to 12:30 p.m., for maintenance work.


--- AOLELE STREET ---


1) HONOLULU (WEEKEND/NIGHT WORK)

Closure of Aolele Street in the eastbound direction in the vicinity of the Airport toll booths on Sunday night, March 1, through Friday morning, March 6, from 9 p.m. to 5 a.m., for The Rail project. Motorists will be detoured to Rodgers Street.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299


2) HONOLULU (NIGHT WORK)

Lane closure on Aolele Street in both directions between Aolewa Place and Lagoon Drive on Monday night, March 3, through Friday morning, March 6, from 9 p.m. to 5 a.m., for The Rail project. Traffic will be stopped intermittently.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299


3) HONOLULU (NIGHT WORK)

Lane closure on Aolele Street in both directions between Nimitz Highway and the Daniel K. Inouye International Airport on Monday night, March 2, through Friday morning, March 6, from 9 p.m. to 5 a.m., for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299


--- KALIHI STREET (ROUTE 63) ---


1) KALIHI (NIGHT WORK)

Roving lane closure on Likelike Highway in both directions between King Street and North School Street on Monday, March 2, through Friday, March 6, from 9 p.m. to 4 a.m., for lighting maintenance.


--- LILIHA STREET ---


1) KALIHI (NIGHT WORK)

Roving lane closure on Liliha Street in both directions in the vicinity of the H-1 Freeway on Monday, March 2, through Friday, March 6, from 9 p.m. to 4 a.m., for maintenance work.


--- MAIN STREET ---


1) PEARL HARBOR (WEEKEND WORK)

Full lane closure on Main Street at the intersection of Nimitz Highway in both directions on Sunday, March 1, from 10 a.m. to 6 p.m., for The Rail project.


For more information, please visit the project website for The Rail at http://www.honolulutransit.org/.


--- MIDDLE STREET ---


1) KALIHI (NIGHT WORK)

Roving closure on Middle Street in both directions in the vicinity of Kamehameha Highway on Monday, March 2, through Friday, March 6, from 9 p.m. to 4 a.m., for lighting maintenance work.


--- UALENA STREET ---


1) HONOLULU (WEEKEND/NIGHT WORK)

Closure of Ualena Street in both directions between Ohohia Street and Lagoon Drive on Sunday night, March 1, through Friday morning, March 6, from 8 p.m. to 4 a.m., for The Rail project. There will be no street parking along the travel lanes and the sidewalk will be closed.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299


bottom of page