top of page

DOT RELEASE: O'ahu Lane Closures for week of March 7 - 13


PLEASE NOTE: Lane closure schedules may change at any time without further notice.  All projects are weather permitting.


--- H-1 FREEWAY ---


1) AIEA TO HONOLULU

Lane closure on the H-1 Freeway in the westbound direction in the vicinity of the Middle Street overpass on Friday, March 13, from 9:30 a.m. to 11 a.m., for maintenance work.


2) EWA

Right lane closure on the H-1 Freeway in the eastbound direction between the Kualakai Parkway underpass and Kunia/Waipahu/Ewa offramp (Exit 5) on Monday, March 9, through Friday, March 13, from 9 a.m. to 3 p.m., for maintenance work.


3) HONOLULU

Lane closures on the H-1 Freeway in both directions between the Piikoi Street onramp and the Punahou Street overpass on Monday, March 9, through Friday, March 13, from 8 a.m. to 12 a.m., for signage work.


4) HONOLULU

Lane closure on the H-1 Freeway in both directions between the Kapiolani Interchange and Ainakoa Avenue on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m., for guardrail and shoulder improvements. The speed limit in this area is reduced to 40 mph during closure hours.


5) HONOLULU

Left lane closure on the H-1 Freeway in the westbound direction between the H-1/H-2 Split and Managers Drive overpass on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 12:30 p.m., for guardrail repairs.


6) HONOLULU (WEEKEND/NIGHT WORK)

Lane closure on the eastbound Airport offramp (Exit 16) to Paiea Street/Aolele Street on Sunday night, March 8, through Friday morning, March 13, from 9 p.m. to 5 a.m., for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


7) HONOLULU (NIGHT WORK)

Roving lane closure on the H-1 Freeway in both directions between Middle Street and Kalanianaole Highway on Monday, March 9, through Friday, March 13, from 8:30 p.m. to 4 a.m., for maintenance work.


8) HONOLULU (WEEKEND/NIGHT WORK)

Closure of the Middle Street offramp (Exit 19A) from the H-1 Freeway in the westbound direction on Wednesday, March 11, from 9:30 a.m. to 11 a.m., for sign and guardrail work.


9) HONOLULU (NIGHT WORK) Lane closures on the H-1 Freeway in both directions between Piikoi Street and the Punahou Street overpass on Monday night, March 9, through Tuesday morning, March 10, from 10 p.m. to 12 a.m., for concrete barrier work.


10) KAPOLEI (NIGHT WORK)

Closure of the Campbell Industrial Park/Barbers Point Harbor offramp (Exit 1A) from the eastbound H-1 Freeway on Monday night, March 9, through Friday morning, March 13, from 10 p.m. to 4 a.m., for the Kapolei Interchange Complex Phase 2 project. Motorists will be directed to Wakea Street offramp as an alternate route.

For more information, visit the Kapolei Interchange Complex Phase 2 project website at https://www.buildkapolei.com/


11) KAPOLEI (NIGHT WORK)

Closure of the H-1 Freeway in the eastbound direction between the Campbell Industrial Park/Barbers Point Harbor offramp (Exit 1A) and the Wakea Street onramp on Monday night, March 9, through Friday morning, March 13, from 9 p.m. to 4:30 a.m., for the Kapolei Interchange Complex, Phase 2 project. Eastbound motorists will be directed to Kalaeloa Boulevard as an alternate route. Closure will only occur if the westbound lanes are open.


12) KAPOLEI (WEEKEND/NIGHT WORK)

Closure of the H-1 Freeway in the westbound direction between the Makakilo Drive overpass and the Campbell Industrial Park/Barbers Point Harbor offramp (Exit 1) on Sunday night, March 8, through Friday morning, March 13, from 10 p.m. to 5 a.m., for the Kapolei Interchange Complex Phase 2 project. Motorists will be directed to Makakilo/Kapolei/Kalaeloa offramp (Exit 2) as an alternate route.


For more information, visit the Kapolei Interchange Complex Phase 2 project website at https://www.buildkapolei.com/


13) KAPOLEI (WEEKEND/NIGHT WORK)

Closure of the H-1 Freeway in the westbound direction between the Kapolei/Ewa offramp (Exit 3) and the Makakilo Drive overpass, on Sunday night, March 8, through Friday morning, March 13, from 10:30 p.m. to 4 a.m., for the Kapolei Interchange Complex Phase 2 project. Motorists will be directed to the Kapolei/Ewa offramp (Exit 3) as an alternate route.


For more information, visit the Kapolei Interchange Complex Phase 2 project website at https://www.buildkapolei.com/


14) PEARL CITY

Left lane closure on the H-1 Freeway in both directions in the vicinity of Kaahumanu Street overpass on Tuesday, March 10, from 9 a.m. to 11 a.m., for maintenance work.


For more information, visit the Kapolei Interchange Complex Phase 2 project website at https://www.buildkapolei.com/


15) PEARL HARBOR (NIGHT WORK)

Lane closure on the Nimitz Highway/Hickam AFB offramp (Exit 15) from the H-1 Freeway in the eastbound direction on Monday night, March 9, through Friday morning, March 13, from 8 p.m. to 4 a.m., for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


--- H-201 MOANALUA FREEWAY ---


1) HALAWA

Roving lane closure on the H-201 Moanalua Freeway in both directions in the vicinity of the Halawa Interchange on Friday, March 13, from 9 a.m. to 11 a.m., for maintenance work.


2) MOANALUA (WEEKEND/NIGHT WORK)

Right lane closure on the H-201 Moanalua Freeway in the westbound direction between the Middle Street overpass and Ahua Street overpass on Sunday night, March 8, through Friday morning, March 13, from 9 p.m. to 4 a.m., for road improvements.


3) MOANALUA (NIGHT WORK)

Roving lane closure on the H-201 Moanalua Freeway in both directions between the Halawa Interchange and Middle Street on Monday, March 9, through Friday, March 13, from 9 p.m. to 4 a.m., for maintenance work.


4) MOANALUA

Left lane closure on the H-201 Moanalua Freeway in the eastbound direction between the Funston Road overpass and the Middle Street overpass on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m., for lighting improvements.


5) MOANALUA (NIGHT WORK)

Lane closure on the H-201 Moanalua Freeway in the westbound direction between the Middle Street overpass and the Funston Road overpass on Monday, March 9, through Friday, March 13, from 9 p.m. to 3 a.m., for lighting improvements.


--- H-3 FREEWAY ---


1) KANEOHE (WEEKEND/NIGHT WORK)

Roving lane closure on the H-3 Freeway in both directions in the vicinity of the Harano Tunnels on Sunday night, March 8, through Friday morning, March 13, from 9 p.m. to 4 a.m., for pavement marking installations.


--- FARRINGTON HIGHWAY (ROUTES 93/930) ---


1) KAPOLEI

Roving lane closure on Farrington Highway (Route 93) in both directions in the vicinity of Kalaeloa Boulevard on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m., for maintenance work.


2) NANAKULI

Lanes shifted on Farrington Highway (Route 7101) in the eastbound direction between Kunia Road and the H-1 Freeway on Monday, March 9, through Thursday, March 13, from 8:30 a.m. to 3 p.m., for HECO work.


3) NANAKULI (NIGHT WORK)

Lane closure on Farrington Highway (Route 93) in the eastbound direction between Laaloa Street and the H-1 Freeway on Monday night, March 9, through Friday morning, March 13, from 8:30 p.m. to 4:30 a.m., for signage work.


4) NANAKULI (NIGHT WORK)

Lane closure on Farrington Highway (Route 93) in the eastbound direction between Waiomea Street and Laaloa Street on Monday night, March 9, through Friday morning, March 13, from 10 p.m. to 5 a.m., for signage work.


5) WAIANAE

Right lane closure on Farrington Highway (Route 93) in the westbound direction in the vicinity of Ala Akau Street on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 12:30 p.m., for lighting work.


6) WAIANAE

Right lane closure on Farrington Highway (Route 93) in the eastbound direction between Maipalaoa Road and St. John’s Road on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m., for the Maipalaoa Bridge Replacement project. The eastbound shoulder lane will be closed over a 24-hour period. Two travel lanes are open in the eastbound direction and one lane in the westbound direction.


7) WAIANAE

Lane closure on Farrington Highway in both directions between Moua Street and Makua Valley Road on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m., for overhead utility work. Traffic will be contraflowed.


8) WAIPAHU TO PEARL CITY (HART JURISDICTION)

Farrington Highway (Route 7101) between Kahi Mohala and Waipahu High School is City Maintained State Highway.


Lanes will be closed as needed on Farrington Highway (Route 7101) between Kunia Road and the H-1 Freeway Overpass (near Leeward Community College), on Sunday, March 8, through Friday, March 13, over a 24-hour period, for The Rail.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299


--- KAHEKILI HIGHWAY (ROUTE 83) ---


1) KANEOHE

Left lane closure on Kahekili Highway (Route 83) in both directions between Kamehameha Highway and Haiku Road on Monday, March 9, through Friday, March 13, from 7:30 a.m. to 12:30 p.m., for landscaping work.


2) KANEOHE

Roving closure on Kahekili Highway (Route 83) in both directions between Kamehameha Highway and Likelike Highway on Monday, March 9, through Friday, March 13, from 7:30 a.m. to 12:30 p.m., for litter and graffiti removal.


--- KALANIANAOLE HIGHWAY (ROUTES 61/72) ---


1) HAWAII KAI

Lane closure on Kalanianaole Highway (Route 72) in both directions between Hanauma Bay Road on Monday, March 9, through Friday, March 13, from 7:45 a.m. to 12:30 p.m., for grass trimming.


2) KAILUA

Lane closure of Kalanianaole Highway in both directions between Keolu Drive and Kailua Road on Monday, March 9, through Friday, March 13, from 9 a.m. to 1:30 p.m., for signage work.

--- KAMEHAMEHA HIGHWAY (ROUTES 80/83/99) ---


1) HALAWA (HART JURISDICTION)

Kamehameha Highway (Route 99) between Aloha Stadium and the vicinity of Sam’s Club by Acacia Road is City Maintained State Highway.

Lane closure on Kamehameha Highway (Route 83) in the eastbound direction between Ford Island Bridge and Salt Lake Boulevard on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m., for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


2) HALAWA TO JOINT BASE PEARL HARBOR HICKAM (HART JURISDICTION)

Kamehameha Highway (Route 99) between Aloha Stadium and Center Drive is City Maintained State Highway.

Lanes may be closed as needed on Kamehameha Highway in both directions between Center Drive and Salt Lake Boulevard, on Sunday, March 8, through Friday, March 13, 24 hours a day.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


3) HALEIWA (WEEKEND CLOSURE)

Right turn closed on Kamehameha Highway (Route 99) in the southbound direction onto Kaukonahua Road on Sunday, March 8, from 5:30 a.m. to 10:30 a.m., for the Pineapple Sprint Road Race. Flaggers will be onsite to assist with traffic control.


4) HAUULA

Right lane closure on Kamehameha Highway (Route 83) in the southbound direction in the vicinity of Puhuli Street on Monday, March 9, from 8:30 a.m. to 3 p.m., for pole repairs. Traffic will be contraflowed.


5) HONOLULU (NIGHT WORK)

Lane closure on Kamehameha Highway (Route 99) in the eastbound direction between Center Drive and Nimitz Highway on Monday, March 9, through Friday, March 13, from 8 p.m. to 4 a.m., for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


6) HONOLULU (HART JURISDICTION)

One lane closure on Kamehameha Highway in both directions between Middle Street and Puuhale Road, for The Rail project.


On Sunday, March 8, through Friday, March 13, from 7 p.m. to 5 a.m.On Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


7) HONOLULU (HART JURISDICTION)

Lane closure on Kamehameha Highway in both directions between Kaonohi Street and Lehua Avenue on Sunday, March 8, through Friday, March 13, over a 24-hour period, for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.

8) KAHUKU

Lane closure on Kamehameha Highway (Route 83) in both directions in the vicinity of Marconi Road on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m., for road improvements. Traffic will be contraflowed.


9) KANEOHE

Lane closure on Kamehameha Highway (Route 83) in the Kailua-bound direction in the vicinity of the Pali Highway on Monday, March 9, through Friday, March 13, from 9 a.m. to 3 p.m., for electrical work.


10) LAIE

Lane closure on Kamehameha Highway (Route 83) in the southbound direction in the vicinity of Naniloa Loop on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m., for pole replacements. Traffic will be contraflowed.


11) PEARL CITY

Lane closure on Kamehameha Highway (Route 99) in the westbound direction in the vicinity of Waihona Street on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m., for waterline work.


12) PUPUKEA

Lane closure on Kamehameha Highway (Route 83) in the southbound direction between Pupukea Road and Kapuhi Street on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m., for HECO work. Traffic will be contraflowed.


13) PUPUKEA

Lane closure on Kamehameha Highway (Route 83) in the southbound direction in the vicinity of Kaunala Street on Tuesday, March 10, from 8:30 a.m. to 3 p.m., for HECO work.

14) WAIKANE TO AHUIMANU


Alternating lane closure on Kamehameha Highway in both directions between Waikane Valley Road and Ahuimanu Road on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m., for sign removal. Traffic will be contraflowed.


--- NIMITZ HIGHWAY (ROUTE 92) ---


1) HONOLULU (HART JURISDICTION)

Nimitz Highway (Route 92) between Richards Street and Awa Street is City Maintained State Highway.


Lane closures on Nimitz Highway in both directions between River Street and Richards Street over a 24-hour period, seven days a week.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


2) HONOLULU (NIGHT WORK)

Roving lane closure on Nimitz Highway (Route 92) in both directions in the vicinity of Valkenburgh Street on Monday, March 9, and Tuesday, March 10, from 9 p.m. to 4 a.m., for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


3) HONOLULU (HART JURISDICTION)


Nimitz Highway (Route 92) between Elliott Street and Sand Island Access Road is City Maintained State Highway.


Lanes closed in the eastbound direction between Elliott Street and Aolele Street on Sunday night, March 8, through Friday morning, March 13, from 8 p.m. to 4 a.m. and from Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m.


Lanes closed in both directions between Sand Island Access Road and Lagoon Drive on Sunday, March 8, through Friday, March 13, from 8 :30 a.m. to 3 p.m. and from 9 p.m. to 5 a.m.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


4) HONOLULU

Roving lane closure on Nimitz Highway (Route 92) in both directions between Waiakamilo Road and River Street on Tuesday, March 10, through Wednesday, March 11, from 9 a.m. to 2:30 p.m., for maintenance work.


5) HONOLULU (WEEKEND/NIGHT WORK

Right lane closure on Nimitz Highway (Route 92) in the eastbound direction between Valkenburgh Street and Aolele Street on Sunday night, March 8, through Friday morning, March 13, from 8 p.m. to 4 a.m., for The Rail project.

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


6) HONOLULU (WEEKEND/NIGHT WORK)

Lane closure on Nimitz Highway (Route 92) in the eastbound direction between the H-1 Freeway/Middle Street/Dillingham Boulevard offramp (Exit 18B) and Middle Street on Sunday, March 8, through Friday, March 13, from 9 p.m. to 5 a.m., for The Rail project.

See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


7) HONOLULU (NIGHT WORK)

Lane closure on Nimitz Highway (Route 92) in both directions between Puuhale Road and Alakawa Street on Monday, March 9, through Friday, March 13, from 6 p.m. to 2 a.m., for sewer work.


8) HONOLULU (HART JURISDICTION)

Nimitz Highway (Route 92) between Awa Street and Halekauwila Street is a City Maintained State Highway

Lane closures on Nimitz Highway (Route 92) in both directions between Alakea Street and Awa Street on Sunday, March 8, through Friday, March 13, from 6 p.m. to 5 a.m. and on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m., for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299


--- PALI HIGHWAY (ROUTE 61) ---


1) NUUANU (WEEKEND/NIGHT WORK)

Lane closure on the Pali Highway (Route 61) in the northbound direction between Waokanaka Street and Kamehameha Highway on Sunday night, March 8, through Friday morning, March 13, from 8 p.m. to 5 a.m., for electrical and resurfacing work.

For more information, please visit the Pali Highway Resurfacing project website at http://palihighway.org

2) NUUANU


Lane closures on the Pali Highway in both directions between Auloa Road and Nuuanu Pali Drive on Sunday, March 8, through Friday, March 13, for construction activities.

Lanes will be closed in the Honolulu-bound direction from 8 p.m. to 4 a.m.Lanes will be closed in the Kailua-bound direction from 8 p.m. to 5 a.m.

For more information visit the City’s Dowsett Highlands Sewer Relief project website at http://palisewer.org


3) NUUANU (WEEKEND/NIGHT WORK)

Closure of the Pali Highway in the southbound direction between Auloa Road and Nuuanu Pali Drive on Sunday night, March 8, through Monday morning, March 9, from 11 p.m. to 4 a.m., for rock shed work.


4) NUUANU (NIGHT WORK)

Lane closure on Pali Highway in both directions between Nuuanu Pali Drive and Auloa Road on Monday night, March 9, through Friday morning, March 13, from 8 p.m. to 5 a.m., for rock shed and resurfacing work.


5) NUUANU

Lane closure on Pali Highway (Route 61) in the Honolulu-bound direction between Pulelehua Street and Waokanaka Street on Monday, March 9, through Friday, March 13, from 9 a.m. to 3:30 p.m., for the Dowsett Highlands Sewer Relief project.

For more information visit the City’s Dowsett Highlands Sewer Relief project website at http://palisewer.org


6) NUUANU

Roving closure on Pali Highway in the Kailua-bound direction in the vicinity of Dowsett Avenue on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m., for sewer work.


For more information visit the City’s Dowsett Highlands Sewer Relief project website at http://palisewer.org


7) NUUANU (NIGHT WORK)

Lane closure on the Pali Highway in both directions between Auloa Road and Nuuanu Pali Drive on Monday, March 9, through Friday, March 13, for construction activities.

Lanes will be closed in the Honolulu-bound direction from 9 a.m. to 5 p.m.Lanes will be closed in the Kailua-bound direction from 7 a.m. to 3 p.m.

For more information, please visit the Pali Highway Resurfacing project website at http://palihighway.org


8) NUUANU (NIGHT WORK)

Lane closure on the Pali Highway (Route 61) in both directions in the vicinity of Vineyard Boulevard on Monday, March 9, through Friday, March 13, for median and electrical work.

Lane will be closed in the southbound direction rom 9 a.m. to 5 p.m.Lane will be closed in the northbound direction from 7 a.m. to 3 p.m.Lanes will be closed in both directions from 8 p.m. to 5 a.m.


For more information, please visit the Pali Highway Resurfacing project website at http://palihighway.org


9) NUUANU

Lane closure on the Pali Highway (Route 61) in the Honolulu-bound direction between Vineyard Boulevard and Puiwa Road on Monday, March 9, through Friday, March 13, from 9 a.m. to 3:30 p.m., for sewer work.


For more information visit the City’s Dowsett Highlands Sewer Relief project website at http://palisewer.org


10) NUUANU

Roving lane closure on the Pali Highway (Route 61) in both directions between South School Street and Nuuanu Pali Drive on Monday, March 9, through Friday, March 13, from 8 a.m. to 1 p.m., for signage work.


--- ALA MOANA BOULEVARD ---


1) HONOLULU

Lane closure on Ala Moana Boulevard in the westbound direction between Coral Street and Channel Street on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m., for utility installations.


--- KALAELOA BOULEVARD ---


1) KAPOLEI (WEEKEND/NIGHT WORK)

Closure of Kalaeloa Boulevard in the northbound direction between Kapolei Parkway and Farrington Highway on Sunday night, March 8, through Friday morning, March 13, from 8 p.m. to 4:30 a.m., for the Kapolei Interchange Complex Phase 2 project. Motorists will be detoured to Kapolei Parkway.


For more information, visit the Kapolei Interchange Complex Phase 2 project website at https://www.buildkapolei.com/


--- VINEYARD BOULEVARD ---


1) HONOLULU (NIGHT WORK)

Roving lane closure on Vineyard Boulevard in both directions between Palama Street and Lusitania Street on Monday, March 9, through Friday, March 13, from 9 p.m. to 4 a.m., for lighting work.


--- LAGOON DRIVE ---


1) HONOLULU

Lane closure on Lagoon Drive in the northbound direction between Aolele Street and Waiwai Loop on Monday, March 9, through Friday, March 13, from 7 a.m. to 5 p.m., for The Rail work.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299.


--- KUALAKAI PARKWAY ---


1) EWA (HART JURISDICTION)

Kualakai Parkway between Farrington Highway and Keahumoa Parkway is City Maintained State Highway.


Lane closure on Kualakai Parkway in both directions between Keahumoa Parkway and Farrington Highway on Monday, March 9, through Friday, March 13, from 8:30 a.m. to 3 p.m., for the rail. One through lane is to remain open.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299


--- FORT BARRETTE ROAD ---


1) KAPOLEI (NIGHT WORK)

Four lane closures on Fort Barrette Road one direction at a time at the Farrington Highway intersection on Monday night, March 9, through Friday morning, March 13, from 9 p.m. to 4 a.m., for resurfacing work. Traffic will be let through by the remaining open lane.


--- FORT WEAVER ROAD (ROUTE 76) ---


1) EWA

Lane closure on Fort Weaver Road in both directions in the vicinity of Farrington Highway on Monday, March 9, through Thursday, March 12, from 8:30 a.m. to 2 p.m., for bridge maintenance.


--- JARRETT WHITE ROAD ---


1) MOANALUA (NIGHT WORK)

Roving closure on Jarrett White Road in both directions between Tripler Hospital and Puuloa Road on Monday night, March 9, through Friday morning, March 13, from 9 p.m. to 4 a.m., for lighting work.


---PUULOA ROAD ---


1) MOANALUA (NIGHT WORK)

Roving lane closures on Puuloa Road/Jarrett White Road in both directions between Nimitz Highway and Tripler Hospital on Monday, March 9, through Friday, March 13, from 9 a.m. to 1:30 p.m. and from 9 p.m. to 4 a.m., for lighting, maintenance and restriping work.


--- AOLELE STREET ---


1) HONOLULU (WEEKEND/NIGHT WORK)

Closure of Aolele Street in the eastbound direction in the vicinity of the Airport toll booths on Sunday night, March 8, through Friday morning, March 13, from 9 p.m. to 5 a.m., for The Rail project. Motorists will be detoured to Rodgers Street.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299


2) HONOLULU (WEEKEND/NIGHT WORK)

Lane closures on Aolele Street in both directions between Aolewa Place and Lagoon Drive on Sunday night, March 8, through Friday morning, March 13, from 9 p.m. to 4 a.m., for The Rail project. Traffic will be detoured.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299


3) HONOLULU (NIGHT WORK)

Lane closure and traffic shift on Aolele Street in both directions between Nimitz Highway and the Daniel K. Inouye International Airport on Monday night, March 9, through Friday morning, March 13, from 9 p.m. to 5 a.m., for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299


--- KAUA STREET ---


1) MOANALUA

Lane closure on Kaua Street in the westbound direction between Funston Road and Middle Street on Thursday, March 12, from 9:30 a.m. to 11 a.m., for maintenance work.


--- LILIHA STREET ---


1) KALIHI (NIGHT WORK)

Roving lane closure on Liliha Street in both directions in the vicinity of the H-1 Freeway on Monday, March 9, through Friday, March 13, from 9 p.m. to 4 a.m., for maintenance work.


--- MIDDLE STREET ---


1) KALIHI (NIGHT WORK)

Roving closure on Middle Street in both directions in the vicinity of Kamehameha Highway on Monday, March 9, through Friday, March 13, from 9 p.m. to 4 a.m., for lighting maintenance work.


--- UALENA STREET ---


1) HONOLULU (WEEKEND/NIGHT WORK)

Closure of Ualena Street in both directions between Ohohia Street and Lagoon Drive on Sunday night, March 8, through Friday morning, March 13, from 8 p.m. to 4 a.m., and 8:30 a.m. to 3 p.m., for The Rail project. There will be no street parking along the travel lanes and the sidewalk will be closed.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299


--- AOLEWA PLACE ---


1) HONOLULU (NIGHT WORK)

Lane shift on Aolewa Place at the intersection of Aolele Street on Monday, March 9, through Friday, March 13, from 2 p.m. to 10 p.m., for The Rail project.


See HART website (https://www.honolulutransit.org/inform/traffic) for additional information or call the rail hotline (808) 566-2299



bottom of page